Saturday, December 19, 2009

Bathroom Demolition Work

So, the bathroom renovation isn't going quite as quickly as I would like....It seems that we hardly ever have any free time on the weekends anymore. During the week we have maybe an hour of down time from 9:00 till 10:00 after we get G in bed, and get the house organized. So that doesn't leave much time to bathroom work. But never the less, it is progressing slowly but surely.

Today I took out the old tile that was around the jacuzzi tub. It is going to take a little drywall and plaster work to get it ready for new tile, but it shouldn't be too bad. In several places the drywall came off in chunks with the tiles since they used adhesive instead of thinset to set the tiles. Hopefully I can make some good headway over the Christmas break and get everthing finished except for the floor tile. That is the biggie that is still looming out there....

1 comment: